Go top
Project information

Techical assessment of the Traffic Management and Regulation System (SRC) for the GIF high speed line

A. Fernández-Cardador A.P. Cucala

July 2004 - December 2004

Funding entity Ineco


The project consists of technical assistance to INECO for the Traffic Management and Regulation System (SRC), located at the Control Centre of the high speed line. The SRC is composed of three real-time subsystems: Traffic Management and Monitoring (GSE), Traffic Regulation Tool (SAR) and Passengers Information System (SIV). The SRC includes the Traffic Planification Tool (off-line), which is able to simulate the traffic planning and to detect conflicts.


ASSRC2